Modules / Plan

Projects

The efforts too big for one line, broken into steps on a board you named yourself.

  • Checklist engine
  • Switch in the library
Engine
Checklist, on a board
Columns
Yours to name
Steps
Drag between columns
Due dates
Optional, per step
A project called Ship Cadence 1.0 laid out in columns: three steps to do, nothing in progress, and three finished steps crossed out under Done.
Three steps to go on Cadence 1.0, three already crossed off.

How it works

  1. Columns you named

    To do, in progress and done is the default. Rename them, add one, take out the column you never used.

  2. Steps, not tickets

    A step is a line of text you drag from one column to the next. Nobody is assigned, nothing is estimated in points, and no one expects a status update on Friday.

  3. Done stays on the board

    Finished steps keep their own column with a line through them, which is all the progress bar a project like this needs.

Keep Projects. Ignore the other twenty five.